Syngas pilot in Höganäs. The preparations at Cortus AB’s facility in Höganäs to be able to host the Swedish project are now complete. On the right side of the picture is the prepared gravel surface where the pilot plant from RISE Research Institutes of Sweden is to be set up. On the left of the picture is the high-pressure storage (white cylinders) which is the guarantor of being able to supply the pilot plant with syngas around the clock for 24 months.